SCOPE:

Construction engineering leadership for the largest indoor waterpark and largest indoor wavepool in North America, part of a $5B retail and entertainment complex.

We supported complex concrete construction and logistics across a highly irregular structural system with dense coordination between trades. Through detailed 3D modeling of reinforcement and waterstop systems, the team ensured constructability and watertight performance, enabling on-time and on-budget delivery.

OUR ROLES:

Dave Douglas was the full-time Technical Advisor for Concrete Construction and Logistics; and Project Manager in latter years of the project.

NOTE: Project completed at a previous firm

Construction site with steel rebar framework for concrete foundation, surrounded by partially built structures and construction materials.
A large construction site with cranes and building materials, with a city skyline and river in the background under a partly cloudy sky.
Aerial view of a large construction site with steel framework, cranes, and building structures in progress, surrounded by roads, parking lot, and greenery.
Aerial view of a construction site with multiple cranes building a large complex, with a stadium in the background.
Aerial view of a construction site with multiple cranes and a partially built multi-story building, with surrounding roads, some green areas, and a colorful modern building in the background.
Aerial view of a large building under construction, with cranes, construction equipment, and workers, surrounded by roads and greenery.